Skip to product information
1 of 7

inswalk — Casual Minimalist Shoes

Mini GPS Tracker with Real-Time Location, Cloud Logging, 500mAh Battery, GPS/LBS Dual Mode

Mini GPS Tracker with Real-Time Location, Cloud Logging, 500mAh Battery, GPS/LBS Dual Mode

4.6 out of five star rating on Trustpilot
(4.8 / 5 Verified Reviews)
Regular price £45.95
Regular price Sale price £45.95
Sold out
Taxes included.

📌 Feel: Connected, Free, Balanced. Healthy feet are the foundation of a healthy body

  • Better posture and eases lower back pain
  • Natural toe alignment, relieving knee pressure
  • Promotes blood circulation, balance and stability
  • Boosts toe mobility and reduces foot stiffness
  • Builds, stabilizes foot muscles and natural gait correct
  • Less strain on joints for effortless movement

Precision Technology & Dual-Mode Positioning

The Davy UltraTrack is a highly compact telematics tracker designed for the precise monitoring of mobile goods. The system integrates a highly sensitive GPS receiver with a passive antenna and utilizes a dual-mode method (GPS and LBS). This ensures reliable positioning with an accuracy of 5–10 meters, even in areas with limited satellite visibility by using cell tower triangulation (LBS).

Vivolux UltraTrack Compact Design

Security Modules & Autonomous Monitoring

  • Intelligent Alarm Management: The internal sensors detect unauthorized movements and immediately trigger status alerts in case of vibrations, speed violations, or power interruptions. This serves as an effective theft protection for vehicles and valuables.
  • Energy Efficiency & Telemetry: An internal 500mAh lithium-ion battery powers the device. When the charge level drops below 20%, the system automatically generates a threshold alarm to ensure continuous readiness for use.
  • Industrial Design: With dimensions of 35 x 20 x 14 mm and a weight of 50 g, the device can be discreetly placed. The integrated magnetic base allows for secure mounting on metallic surfaces without additional installation materials.
  • Advanced Features: The device supports real-time tracking with cloud synchronization as well as a remote listening function for acoustic room monitoring if needed.
UltraTrack GPS Installation

Technical Specifications:

Location Method GPS / LBS (Dual-Mode)
Accuracy 5 – 10 Meters (GPS)
Battery Capacity 500 mAh Lithium-Ion (3.7V - 4.2V)
Temperature Range -20°C to +70°C
Dimensions / Weight 35 x 20 x 14 mm / 50 g
Interfaces Cloud Upload, App Interface (English)
UltraTrack Housing Details UltraTrack Application Scenarios

Delivery Contents:

1 × Davy UltraTrack Magnetic Tracker, 1 × USB Charging Cable, 1 × User Manual. Note: A SIM card with a data plan is required for operation (not included).

View full details